Failed garages, tired extensions, condemned outbuildings and internal structures: Croydon’s renovation boom runs through a lot of small demolition. Because most pre-date 2000, the asbestos question comes first.
The sequence is fixed: survey, remove asbestos under the correct category, then take the structure down and clear the footprint; waste streams segregated, transfer notes issued, slab retained or broken out as needed.
Garages, extensions, conservatories, sheds, internal structures
Slab break-out optional, priced in the same quotation
Survey first, asbestos out second, structure down third; every phase documented and priced in writing before a single bar is swung.
Structure assessed for asbestos and stability; party-wall, access and neighbour considerations built into the method before pricing.
Asbestos removal, take-down, waste and reinstatement level stated as separate lines in one written figure; so you see exactly where the money goes.
Suspect materials removed and consigned first; the structure then comes down by hand or machine as scale and access dictate, dust-suppressed and controlled.
Arisings segregated and removed with transfer notes; asbestos consignment notes issued; site left at the agreed level: slab, hardcore or clear ground.
The corner general demolition firms cut is the one that poisons the whole waste stream.
Rear gardens, shared drives and garage blocks are our daily terrain.
Dust suppression, agreed hours and party-wall awareness as standard.
Your groundworker inherits a documented, cleared footprint on programme.
FAQs
Not until the asbestos elements are professionally removed. If the roof or cladding is suspect, knocking it down creates contaminated rubble that no transfer station will take. Sequenced properly, the whole thing costs less than the mistake does.
Small detached domestic structures rarely need it, though conservation areas and certain conditions change the picture; and party-wall notices can apply to attached structures. We’ll flag what applies to yours at survey; confirming with Croydon Council is straightforward where there’s doubt.
Your choice, priced both ways: retain it as a base for the new build, or break it out and clear to ground. Most driveway and garden-room projects keep it; most extensions don’t.
Typically one to two days including the asbestos phase; roof off and consigned, structure down, footprint cleared. Attached structures and tight access add time, all stated in the quote.
Hardcore and metals are segregated for recovery as standard; asbestos is consigned separately to a licensed facility and never mixes with the recyclable streams. You receive documentation for both.
Yes. Internal demolition and structural openings sit alongside our soft-strip work, with the same asbestos-first sequencing. Structural elements are only removed against your engineer’s specification.
We coordinate it. Safe isolation of any supplies to the structure is confirmed before a bar is swung, arranged through your supplier or a qualified trade as the service requires, and evidenced in the job file.
Whatever the structure warrants: a courtesy conversation for detached garages, and a proper position on party-wall notices where structures adjoin. We’ll tell you at survey which applies; before it can become a dispute.
Garages behind terraces in CR7, extensions in the interwar districts, outbuildings on the fringe: every postcode, one asbestos-first sequence.
Questions about a job or a quote? Email the team directly.
[email protected]
[email protected]
Speak to a surveyor, not a call handler.
Sales
07798 984290
Support / Enquiries
07468 437558
2 Park Rd
Guildford GU1 4PH
United Kingdom
CONTACT US
Send us your postcode and a description of the material you’ve found. A surveyor will be with you the same week, and your fixed written price follows within 48 hours.