Skip the refurbishment/demolition survey and a ceiling void can become a contaminated site. We survey, remove, then strip.
Because we handle both the asbestos and the strip-out, there’s no hand-off gap or programme pause. One survey, one RAMS pack, one fixed price. For notifiable projects, we work within CDM 2015 with duties allocated before mobilisation.
Ceilings, partitions, floor coverings, M&E and fixtures to shell.
Small structure demolition including garages, outbuildings and extensions.
Survey first, asbestos out second, strip to shell third. Every phase is priced, documented and handed over before the next trade moves in.
Intrusive survey of every area the works will touch, producing a register your structural and principal contractors can build the programme around.
Identified materials come out first under the correct work category, with clearance testing where required before any following trade enters.
Non-structural elements stripped, waste streams segregated at source metals, timber, inert and general routed separately for maximum recovery.
Agreed structures taken down, arisings cleared, and a documentation pack issued covering the asbestos chain and waste transfer notes.
Asbestos clearance flows straight into strip-out on the same mobilisation
One RAMS pack, one insurance certificate, one throat to choke
Asbestos consigned, recyclables recovered, transfer notes for everything
Priced per phase so the budget survives contact with the building
FAQS
Soft strip removes everything from non-structural ceilings, partitions, finishes, services leaving the frame and shell. Demolition takes the structure itself down. We deliver both, but on pre-2000 buildings neither lawfully starts until the asbestos survey and removal phases are complete.
Our demolition work focuses on small structures, garages, outbuildings, single-storey extensions, internal structures alongside full soft strips of larger buildings. For major structural demolition we work as the asbestos and strip-out phase within a wider contractor’s programme.
No. Management surveys deliberately avoid intrusive inspection, so they can’t clear voids, risers and concealed areas for strip-out. An R&D survey of the affected areas is the legal threshold we can usually scope it from your existing report and drawings quickly.
Work in that zone stops, the material is sampled, and a fixed variation is priced and agreed in writing before anyone proceeds. It’s the only honest way to handle genuinely concealed material and it’s why our crews are asbestos-trained rather than general labour.
Inert material is routed for recovery wherever volumes justify it, and metals and timber are segregated at source. Asbestos never mixes with any of it cross-contaminated loads are rejected at the gate and become everyone’s expensive problem, so segregation is absolute.
Fixed, per phase, following the survey asbestos removal, strip-out and demolition each stated separately so you can see exactly where the money goes and stage the spend if needed.
Once the R&D survey is done and the price agreed, mobilisation is typically days and where NNLW notification applies, that statutory clock is built into the programme we give you rather than discovered mid-plan.
Method first: dust suppression, agreed working hours, protected boundaries and where structures adjoin a clear position on party-wall notices before anything comes down. Croydon’s terraced streets are our home ground; the courtesy call next door is part of the job.
Yes from conversion strip-outs in the town centre to garage and extension demolitions in the residential districts and outbuildings on the southern fringe. One postcode, one survey, one fixed programme.
Questions about a job or a quote? Email the team directly.
[email protected]
[email protected]
Speak to a surveyor, not a call handler.
Sales
07798 984290
Support / Enquiries
07468 437558
2 Park Rd
Guildford GU1 4PH
United Kingdom
CONTACT US
Send us your postcode and a description of the material you’ve found. A surveyor will be with you the same week, and your fixed written price follows within 48 hours.